Home
LOGIN
Request a Login
 
Architectural Review/Builder Info
Upcoming Meeting(s)
Aerial View & Lot Map
Realtor's Info (pdf)
Homes for Sale
Lots for Sale
Map/What's Nearby?
 
Documents
Legal Documents
eForms
Buy Community Documents
Contacts List
Questions & Requests
FAQ's
*ARC ~ Additions / Modifications

BRADY  POINT  PRESERVE
ARC ~ Architectural  Review  Committee 
APPLICATION FORM ADDENDUM for
Additions / Modifications to an Existing Structure
 


Note: All proposed Additions / Modifications locations must be staked on the property for review by the Monday prior to the ARC meeting in which the project will be reviewed. 

Submittals that fail to provide the complete required information will not be reviewed. 

Please make checks payable to:  Brady Point Master Association.

Submittals must be made by 4:00pm the Friday before the ARC meeting.

For ARC question, contact Bill Moore at 904-753-4178 or [email protected]



Owner: First Name::
Owner: Last Name::
LOT Number::
Owner: Mailing Street Address::
Owner Mailing: City, State, Zip::
Owner: Phone Number:
Owner: Email Address::
Builder::
Builder: Street Address::
Builder: Mailing: City, State, Zip::
Builder: Phone Number::
Builder: Email Address::
Architect::
Architect: Street Address::
Architect: City, State, Zip::
Architect: Phone Number::
Architect: Email Address::
APPLICATION / SUBMITTAL FORM
Submittal Fee [$250.00] ~ DATE: *
Submittal Fee ~ CHECK #:*
Construction Completion Binder ~ DATE: *
Construction Completion Binder ~ CHECK #:*
AREA [Sq Ft]:*
Color and Materials to Match Existing Structure:*
Changes to Existing COLOR:*
Changes to Existing MATERIALS:*
Three [3] Sets of Architectural Plans Including [in PDF Format]
--------------------------------------------------------------------------------------------------
a] Site Plan including Grading and Drainage:
b] Survey including Existing Trees, Existing Structures, etc.:
c] Elevations:
d] Landscape Plan:
*More Attachments:
**More Attachments:
Note: All proposed Additions / Modifications locations must be staked on the property for review by the Monday prior to the ARC meeting in which the project will be reviewed.

Submittals that fail to provide the complete required information will not be reviewed.

Please make checks payable to Brady Point Master Association.
Submittals must be made by 4:00pm the Friday before the ARC meeting.

To prevent automated SPAM, please enter 1WG9 to submit your form (case sensitive):*
 

* indicates required field

This site is provided by AtHomeNet